10 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B WARNING Improper installation, adjustment, alteration, service or maintenance can caus
11 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 6. MOUNTING CLEARANCES This heater must be mounted with at least the minimum clearances b
12 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B * RECOMMENDED MOUNTING HEIGHTS are typical to provide optimum comfort in general space hea
13 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B FIGURE 3 SYSTEM ELBOW KIT - see page 50 for 180° elbow dimensions 90° elbows (JS-0528-S
14 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 8. SUSPENDING THE SYSTEM - GENERAL Inadequate or improper suspension of the tube heater ca
15 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 9.1 SET / ITT STRAIGHT TUBE SYSTEM ~ BURNER AND TUBE INSTALLATION 1) Install Hangers: i:
16 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B FIGURE 9: COUPLER INSTALLATION (NOTE: See Section 9.3 for ‘Special Couplers’ at first tu
17 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 9.2 SETU / ITTU ‘U’-TUBE SYSTEM ~ BURNER AND TUBE INSTALLATION TURBULATOR NOTES: Turbu
18 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B FIGURE 11 ‘U’-TUBE TYPICAL HANGER & SUPPORT SPACING 8 - STEEL TUBE(S) 9 - REFLECTO
19 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B SPECIAL COUPLER INSTALLATION 1. Note the 2 holes opposite each other at the swaged end o
2 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B NOTICE: This manual is current for this product. Occasional revision of the product Certif
20 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 10. REFLECTOR INSTALLATION SET-U / ITT-U - ‘U’-TUBE: After burner and tubes have been ins
21 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B FIGURE 15 REFLECTOR EXTENSIONS (OPTIONAL - IF REQUIRED ) 1. Reflector extensions
22 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 11. FLUE VENTING Inadequate venting of a heater may result in asphyxiation, carbon mono
23 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B HORIZONTAL VENT THROUGH THE SIDEWALL: Any horizontal portion of the flue vent system m
24 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B Use approved 4" (10 cm) (JA-0528-XX) or 6" (15 cm) (JA-0529-XX) horizontal wa
25 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B VERTICAL VENT THROUGH THE ROOF: It is the sole responsibility of the installer to ad-here
26 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 12. COMBUSTION AIR DUCTING Do not install filters on the combustion air intake. Ensure a
27 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 13. GAS SUPPLY - HEATER EXPANSION - FLEXIBLE GAS CONNECTION The gas supply must be instal
28 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B NOTE: Access to the manifold pressure test port is on the top of the valve. A 3/16" A
29 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B The flue vent, and combustion air duct (if installed) must also be configured in such a
3 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B TABLE OF CONTENTS TOPIC ... PAGE IMPORTA
30 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 14. ELECTRICAL AND THERMOSTAT WIRING (WIRING DIAGRAMS PAGE 35 & 36, 52) The heate
31 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 18. WIRING DIAGRAM FENWAL DSI (HONEYWELL S87J - PAGE 52) 24 VOLT TWO STAGE GAS VALVE
32 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 19. WIRING DIAGRAM - MULTIPLE 2-STAGE HEATERS PER 2-STAGE THERMOSTAT (FOR SINGLE HEATER
33 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 20. FENWAL DSI: SEQUENCE OF OPERATION / FLAME RECOVERY / SAFETY LOCKOUT Power Up / Stand
34 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B Flame Fault If at any time the main valve fails to close completely and maintains a flame
35 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B USE THE BLACK BARS BELOW AS A GUIDE FOR AD-JUSTMENT. USE THE BARS THAT COINCIDE WITH
36 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 21. TROUBLESHOOTING GUIDE - FENWAL DSI (also see Heater Troubleshooting next page) SYMPTOM
37 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B Improper adjustment, alteration, service or maintenance can cause property damage, injury
38 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B MAIN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS CALL FOR HEAT ENDS: SYSTEM SHUTS
39 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 23. START-UP / COMMISSIONING SHEET COMMISSIONING
4 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B APPLICATION A gas-fired radiant tube heater may be installed for heating of commercial / in
40 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A HIGH AL
41 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B Manufactured and shipped in 10 ft lengths. Swaged tube has approximate 4 inch (10
42 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B FIGURE 22 HANGER SPACING / LENGTH - AIR INTAKE TO VENT END POSITION BURNER END HAN
43 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B Tube Kit Shipping Weight (lbs) 120 170 210 165 165 120 165Nominal Length (ft)
44 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B Tube Kit Shipping 2ndaryWeight (lbs) 100 145 170 170 17065Tube Length (ft) 10&
45 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B MODEL TURBULATOR LENGTH SET / ITT 200/140 - 50 10’ (3 m) SET / ITT 175/125 - 60/50 10’
46 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B ORIFICE CHART - ALTITUDE CONVERSION ~ SEE NOTES ON PREVIOUS PAGE ~ 27. HIGH ALTITUDE I
47 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 28. OPTIONAL ACCESSORIES #2 Lion Chain (115 lb work load) - 200 ft roll ‘S’ Hooks - 1
48 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B Fresh Air Intake Adapter JS-0532-SE Fresh Air Intake Cap—Wall JS-0532-VC Fresh Air Intake
49 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 90 degree Aluminized Steel Elbow Kit (Kit includes: aluminized steel elbow, coupler
5 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B Heater Expansion It is a normal condition that during heat-up and cool-down a tube heater
50 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 29. REPLACEMENT PARTS SET / ITT Burner # PART DESCRIPTION PART # PART DESCRIPTION PRI
51 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B Burners with FENWAL IGNITION CONTROL - Models: SET-F; ITT-F 20 FENWAL DSI CONTROL J
52 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B # PART DESCRIPTION PART # PART DESCRIPTION PRIMARY SUPPLEMENT24 WIRE HANGER JS-0505-EH Sma
53 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B The heater must be electrically grounded in accordance with the National Electrical Code
54 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B HONEYWELL S87J SEQUENCE OF OPERATION The S87 ignition control module is powered by a 24v
55 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B LOW/ UNSTEADY FLAME CURRENT If the current to the S87 flame circuit is less than 1.5 µA o
56 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B CHANNEL MICRO 50N: WIRING DIAGRAM: 2-STAGE THERMOSTAT CONTROL OTHER DSI’s: FENWAL SEE PAGE
57 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B CHANNEL MICRO 50N DSI: SEQUENCE OF OPERATION The MICRO 50N is a three trial ignition cont
58 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B CHANNEL MICRO 50N IGNITION CONTROL - SPECS The MICRO 50N is a microprocessor-based DSI (D
59 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: SET / SE
6 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B Clearance to combustibles Location of flammable or explosive objects, liquids or vapors cl
7 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B TABLE 1 MINIMUM CLEARANCES TO COMBUSTIBLES* FIGURE 1 MINIMUM CLEARANCES TO COMBUSTIBLES*
8 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B VENT END CLEARANCE: Clearances from the vent pipe are determined by local or national insta
9 SET(U)-F / ITT(U)-F Manual IM091221 RD: FEB 2014 RL: 8B 2. INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS Low intensity radiant tube heaters are sui
Commentaires sur ces manuels