STV-JZ I&O Manual
IM090512
RD: MAY 2009
RL: 08A- BA
INSTALLATION / OWNER’S MANUAL
Improper installation, adjustment, alteration, service or
maintenance can cause property damage, injury or death.
Read the installation and operating and maintenance instruc-
tions thoroughly before installing or servicing this equipment.
SAFETY ALERT:
This heater must be installed and serviced only by a trained gas service techni-
cian. Failure to comply could result in personal injury, death, fire and/or property
damage.
Do not store or use gasoline or other flammable vapours and liquids in the
vicinity of this or any other gas fired appliance.
IF YOU SMELL GAS:
 Extinguish any open flame
 Do not attempt to light this or any other appliance
 Don’t touch any electrical switch, or telephone
 Immediately call your gas supplier from a neighbor’s phone
 Follow any and all instruction from your gas supplier
 If your gas supplier is not available, call the fire department
WARNING
FIELD CONVERTIBILITY:
This appliance is field con-
vertible to LP gas.
Keep this manual in a secure place .
Record for future reference:
Model #:
Serial #:
(located on heater rating label)
STV-JZ
VACUUM SERIES
LOW INTENSITY TUBE TYPE INFRARED HEATERS
Vue de la page 0
1 2 3 4 5 6 ... 54 55

Résumé du contenu

Page 1 - VACUUM SERIES

STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA INSTALLATION / OWNER’S MANUAL Improper installation, adjustment, alteration, service or m

Page 2

10 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA WARNING Improper installation, adjustment, alteration, service or maintenance can cause

Page 3 - LOW INTENSITY TUBE TYPE

11 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 6. MOUNTING CLEARANCES This heater must be mounted with at least the minimum clearances

Page 4

12 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA * RECOMMENDED MOUNTING HEIGHTS are typical to provide optimum comfort in general space h

Page 5 - WARNING

13 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA System Configuration 1 Straight line 2 “U” tube with 2 x 90° elbow kits 3 “L” tube

Page 6

14 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 90° ELBOW KIT ASSEMBLY #1 Add the coupler to the 90° elbow over the swaged end of

Page 7 - PROMINENT LOCATION

15 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA #6 After installation of the elbow assembly, fasten the corners of the reflector cov

Page 8

16 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA #11/A Suspend with 3 chains in horizontal posi-tion and continue installing the

Page 9

17 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 8. SUSPENDING THE SYSTEM - GENERAL Inadequate or improper suspension of the tube heater

Page 10 - WARNING

18 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 5) Please NOTE that each hanger has a ‘flat’ side and a ‘cavity’ side – FIGURE 6 a) St

Page 11 - FIGURE 2

19 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA FIGURE 8 REFLECTOR STABILIZER FIGURE 9 PLATE HANGER/ELBOW INSTALLATION see section

Page 12 - RL: 08A- BA

2 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA NOTICE: This manual is current for this product. Occasional revision of the product Cert

Page 13

20 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 9. BURNER AND TUBE INSTALLATION PRIOR TO PROCEEDING with the tube installation: Read a

Page 14

21 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 7) Slide the female end of the second tube over the swage of the first tube a) Ensure

Page 15

22 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA · Do not loosen or remove the fifth nut directly below the burner flange · Secure suspen

Page 16

23 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA The focus shield reflector system can be adjusted to either side up to 45° from horizont

Page 17

24 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA NOTE: Except for the vent end plate hanger, all hangers must be installed with the cavit

Page 18 - IMPORTANT

25 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 11. FLUE VENTING Inadequate venting of a heater may result in asphyxiation, carbon mo

Page 19

26 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA HORIZONTAL VENT THROUGH THE SIDEWALL:  The flue vent system must slope downwards appro

Page 20

27 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA  Use the approved 4" (10 cm) (JA-0528-XX) or 6" (15 cm) (JA-0529-XX) horizon

Page 21 - (See Section 10)

28 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 11A. Combined Length of Vent and Combustion Air Duct:  The individual flue vent or th

Page 22 - Angle burner support

29 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA The air intake will not be located less than:  Three feet above grade  Twelve inches

Page 23

3 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA TABLE OF CONTENTS TOPIC ...PAGE INSTAL

Page 24

30 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 13. GAS SUPPLY - HEATER EXPANSION - FLEXIBLE GAS CONNECTION The gas supply must be insta

Page 25

31 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA NOTE: Access to the manifold pressure test port is on the top of the valve. A 3/16"

Page 26

32 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA The flue vent, and combustion air duct (if installed) must also be configured in such a

Page 27

33 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 14. ELECTRICAL AND THERMOSTAT WIRING (WIRING DIAGRAMS PAGE 35 & 36) The heater

Page 28

34 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 18. WIRING DIAGRAM Maximum Power Flow = 21VA

Page 29 -  Three feet above grade

35 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 19. MULTIPLE TUBE HEATERS per THERMOSTAT Each tube heater requires 120V, 60 HZ electr

Page 30

36 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 20 SEQUENCE OF OPERATION The S87 ignition control module is powered by a 24v transforme

Page 31

37 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA  CHECK 120V SUPPLY TO RELAY SWITCH  IF ELECTRICAL SUPPLY PROBLEM …. MAKE RE-QUIRED R

Page 32

38 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA MAIN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS CALL FOR HEAT ENDS: SYSTEM SHUT

Page 33

39 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 22. SPARK IGNITION CIRCUIT The step-up transformer in the ignition control provides sp

Page 34 - Maximum Power Flow = 21VA

4 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA APPLICATION A gas-fired radiant tube heater may be installed for heating of commercial /

Page 35

40 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA LOW/ UNSTEADY FLAME CURRENT If the current to the S87 flame circuit is less than 1.5 µA

Page 36

41 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 24. START-UP / COMMISSIONING SHEET COMMISSIONING

Page 37 - WARN

42 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A HIGH

Page 38

43 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA  Manufactured and shipped in 10 ft lengths.  Swaged tube has approximate 4 inch (10

Page 39 - 3/16” 1/4”

44 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA FIGURE 22 HANGER SPACING / AIR INTAKE TO VENT LENGTH FIGURE 23 HANGER / REFLECTOR O

Page 40

45 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 26. BURNER & TUBE KIT ASSEMBLY CHART MODELS STV-JZ MODELS STV-JZ are approved for

Page 41 - THE NEXT PAGE

46 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA MODEL TURBULATOR LENGTH (IF REQUIRED) STV-JZ 155-60 not required STV-JZ 155-50 no

Page 42

47 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA ORIFICE CHART - ALTITUDE CONVERSION 28. HIGH ALTITUDE INSTALLATION MODEL NO FOR USE

Page 43

48 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 29. OPTIONAL ACCESSORIES Flue Vent Terminal 4” wall horizontal 6” wall horizontal JA-0

Page 44 - FROM TUBE FLANGE]

49 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 90 degree Elbow Kit* - Aluminized Steel *Kit includes: 1. elbow, 2. tube coupler,

Page 45

5 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA Heater Expansion It is a normal condition that during heat-up and cool-down a tube heate

Page 46 - TURBULATORS:

50 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA #2 Lion Chain (115 lb work load) - 200 ft roll ‘S’ Hooks - 1 7/8” - package of 25 JL-

Page 47 - HIGH ALTITUDE INSTALLATION

51 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA # PART DESCRIPTIONPART #PART DESCRIPTION PRIMARY SUPPLEMENT1AIR INLET COLLARJS-0595-AA 4

Page 48 - 29. OPTIONAL ACCESSORIES

52 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA See Exploded View previous page# PART DESCRIPTION PART # PART DESCRIPTION PRIMARY SUPPLE

Page 49

53 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA # PART DESCRIPTIONPART #PART DESCRIPTION PRIMARY SUPPLEMENT1INLET PIPE ADAPTORJV-2490-XX

Page 50

54 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA # PART DESCRIPTIONPART #PART DESCRIPTION PRIMARY SUPPLEMENT30WEBBED HANGERJS-0505-JZ Web

Page 51 - STV-JZ Burner

55 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: STV-JZ

Page 52

6 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA Clearance to combustibles Location of flammable or explosive objects, liquids or vapors

Page 53 - VACUUM PUMP PARTS

7 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA TABLE 1 MINIMUM CLEARANCES TO COMBUSTIBLES* FIGURE 1 MINIMUM CLEARANCES TO COMBUSTIBLES

Page 54 - TUBE SYSTEM PARTS

8 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA VENT END CLEARANCE: Clearances from the vent pipe are determined by local or national ins

Page 55 - LIMITED WARRANTY CERTIFICATE

9 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 2. INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS Low intensity radiant tube heaters are su