STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA INSTALLATION / OWNER’S MANUAL Improper installation, adjustment, alteration, service or m
10 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA WARNING Improper installation, adjustment, alteration, service or maintenance can cause
11 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 6. MOUNTING CLEARANCES This heater must be mounted with at least the minimum clearances
12 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA * RECOMMENDED MOUNTING HEIGHTS are typical to provide optimum comfort in general space h
13 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA System Configuration 1 Straight line 2 “U” tube with 2 x 90° elbow kits 3 “L” tube
14 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 90° ELBOW KIT ASSEMBLY #1 Add the coupler to the 90° elbow over the swaged end of
15 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA #6 After installation of the elbow assembly, fasten the corners of the reflector cov
16 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA #11/A Suspend with 3 chains in horizontal posi-tion and continue installing the
17 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 8. SUSPENDING THE SYSTEM - GENERAL Inadequate or improper suspension of the tube heater
18 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 5) Please NOTE that each hanger has a ‘flat’ side and a ‘cavity’ side – FIGURE 6 a) St
19 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA FIGURE 8 REFLECTOR STABILIZER FIGURE 9 PLATE HANGER/ELBOW INSTALLATION see section
2 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA NOTICE: This manual is current for this product. Occasional revision of the product Cert
20 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 9. BURNER AND TUBE INSTALLATION PRIOR TO PROCEEDING with the tube installation: Read a
21 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 7) Slide the female end of the second tube over the swage of the first tube a) Ensure
22 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA · Do not loosen or remove the fifth nut directly below the burner flange · Secure suspen
23 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA The focus shield reflector system can be adjusted to either side up to 45° from horizont
24 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA NOTE: Except for the vent end plate hanger, all hangers must be installed with the cavit
25 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 11. FLUE VENTING Inadequate venting of a heater may result in asphyxiation, carbon mo
26 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA HORIZONTAL VENT THROUGH THE SIDEWALL: The flue vent system must slope downwards appro
27 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA Use the approved 4" (10 cm) (JA-0528-XX) or 6" (15 cm) (JA-0529-XX) horizon
28 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 11A. Combined Length of Vent and Combustion Air Duct: The individual flue vent or th
29 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA The air intake will not be located less than: Three feet above grade Twelve inches
3 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA TABLE OF CONTENTS TOPIC ...PAGE INSTAL
30 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 13. GAS SUPPLY - HEATER EXPANSION - FLEXIBLE GAS CONNECTION The gas supply must be insta
31 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA NOTE: Access to the manifold pressure test port is on the top of the valve. A 3/16"
32 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA The flue vent, and combustion air duct (if installed) must also be configured in such a
33 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 14. ELECTRICAL AND THERMOSTAT WIRING (WIRING DIAGRAMS PAGE 35 & 36) The heater
34 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 18. WIRING DIAGRAM Maximum Power Flow = 21VA
35 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 19. MULTIPLE TUBE HEATERS per THERMOSTAT Each tube heater requires 120V, 60 HZ electr
36 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 20 SEQUENCE OF OPERATION The S87 ignition control module is powered by a 24v transforme
37 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA CHECK 120V SUPPLY TO RELAY SWITCH IF ELECTRICAL SUPPLY PROBLEM …. MAKE RE-QUIRED R
38 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA MAIN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS CALL FOR HEAT ENDS: SYSTEM SHUT
39 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 22. SPARK IGNITION CIRCUIT The step-up transformer in the ignition control provides sp
4 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA APPLICATION A gas-fired radiant tube heater may be installed for heating of commercial /
40 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA LOW/ UNSTEADY FLAME CURRENT If the current to the S87 flame circuit is less than 1.5 µA
41 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 24. START-UP / COMMISSIONING SHEET COMMISSIONING
42 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A HIGH
43 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA Manufactured and shipped in 10 ft lengths. Swaged tube has approximate 4 inch (10
44 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA FIGURE 22 HANGER SPACING / AIR INTAKE TO VENT LENGTH FIGURE 23 HANGER / REFLECTOR O
45 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 26. BURNER & TUBE KIT ASSEMBLY CHART MODELS STV-JZ MODELS STV-JZ are approved for
46 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA MODEL TURBULATOR LENGTH (IF REQUIRED) STV-JZ 155-60 not required STV-JZ 155-50 no
47 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA ORIFICE CHART - ALTITUDE CONVERSION 28. HIGH ALTITUDE INSTALLATION MODEL NO FOR USE
48 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 29. OPTIONAL ACCESSORIES Flue Vent Terminal 4” wall horizontal 6” wall horizontal JA-0
49 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 90 degree Elbow Kit* - Aluminized Steel *Kit includes: 1. elbow, 2. tube coupler,
5 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA Heater Expansion It is a normal condition that during heat-up and cool-down a tube heate
50 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA #2 Lion Chain (115 lb work load) - 200 ft roll ‘S’ Hooks - 1 7/8” - package of 25 JL-
51 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA # PART DESCRIPTIONPART #PART DESCRIPTION PRIMARY SUPPLEMENT1AIR INLET COLLARJS-0595-AA 4
52 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA See Exploded View previous page# PART DESCRIPTION PART # PART DESCRIPTION PRIMARY SUPPLE
53 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA # PART DESCRIPTIONPART #PART DESCRIPTION PRIMARY SUPPLEMENT1INLET PIPE ADAPTORJV-2490-XX
54 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA # PART DESCRIPTIONPART #PART DESCRIPTION PRIMARY SUPPLEMENT30WEBBED HANGERJS-0505-JZ Web
55 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: STV-JZ
6 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA Clearance to combustibles Location of flammable or explosive objects, liquids or vapors
7 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA TABLE 1 MINIMUM CLEARANCES TO COMBUSTIBLES* FIGURE 1 MINIMUM CLEARANCES TO COMBUSTIBLES
8 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA VENT END CLEARANCE: Clearances from the vent pipe are determined by local or national ins
9 STV-JZ I&O Manual IM090512 RD: MAY 2009 RL: 08A- BA 2. INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS Low intensity radiant tube heaters are su
Commentaires sur ces manuels