STW-JZ / IW I&O Manual
IM101229
RL: 12A- BA
RD: DEC 2010
INSTALLATION / OWNER’S MANUAL
Improper installation, adjustment, alteration, service or
maintenance can cause property damage, injury or death.
Read the installation and operating and maintenance instruc-
tions thoroughly before installing or servicing this equipment.
SAFETY ALERT:
This heater must be installed and serviced only by a trained gas service techni-
cian. Failure to comply could result in personal injury, death, fire and/or property
damage.
Do not store or use gasoline or other flammable vapours and liquids in the
vicinity of this or any other gas fired appliance.
IF YOU SMELL GAS:
 Extinguish any open flame
 Do not attempt to light this or any other appliance
 Don’t touch any electrical switch, or telephone
 Immediately call your gas supplier from a neighbor’s phone
 Follow any and all instruction from your gas supplier
 If your gas supplier is not available, call the fire department
WARNING
FIELD CONVERTIBILITY:
This appliance is field con-
vertible to LP gas.
~ See page 48 ~
Keep this manual in a secure place .
Record for future reference:
Model #:
Serial #:
(located on heater rating label)
&
Model
IW (-2)
CAR WASH & HARSH ENVIRONMENT
LOW INTENSITY TUBE TYPE INFRA RED HEATERS
Model
STW-JZ (-JZ2)
Vue de la page 0
1 2 3 4 5 6 ... 56 57

Résumé du contenu

Page 1 - STW-JZ (-JZ2)

STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 INSTALLATION / OWNER’S MANUAL Improper installation, adjustment, alteration, service o

Page 2

10 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 WARNING Improper installation, adjustment, alteration, service or maintenance can cau

Page 3 - LOW INTENSITY TUBE TYPE

11 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 6. MOUNTING CLEARANCES This heater must be mounted with at least the minimum clearanc

Page 4

12 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 * RECOMMENDED MOUNTING HEIGHTS are typical to provide optimum comfort in general spac

Page 5

13 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 System Configuration 1 Straight line 2 “U” tube with 2 x 90° elbow kits 3 “L” t

Page 6

14 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 90° ELBOW KIT ASSEMBLY #1 Add the coupler to the 90° elbow over the swaged end

Page 7 - PROMINENT LOCATION

15 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 #6 After installation of the elbow assembly, fasten the corners of the reflector

Page 8

16 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 #11/A Suspend with 3 chains in horizontal posi-tion and continue installing t

Page 9

17 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 8. SUSPENDING THE SYSTEM - GENERAL Inadequate or improper suspension of the tube heat

Page 10 - WARNING

18 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 5) Please NOTE that each hanger has a ‘flat’ side and a ‘cavity’ side – FIGURE 6 a)

Page 11 - FIGURE 2

19 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 FIGURE 8 REFLECTOR STABILIZER FIGURE 9 PLATE HANGER/ELBOW INSTALLATION see sect

Page 12 - RD: DEC 2010

2 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 NOTICE: This manual is current for this product. Occasional revision of the product C

Page 13

20 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 8-A. SEISMIC RESTRAINT - LATERAL AND LONGITUDINAL In areas prone to earthquake, or a

Page 14

21 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 9. BURNER AND TUBE INSTALLATION PRIOR TO PROCEEDING with the tube installation: Rea

Page 15

22 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 7) NOTE: 175,000 & 200,000 Btuh Systems:  Refer to Section 9.1, Fig 13 The

Page 16

23 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 · Do not loosen or remove the fifth nut directly below the burner flange · Secure sus

Page 17

24 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 TOOLS REQUIRED ¼” Drill Bit (supplied)  Electric Drill SPECIAL COUPLER INSTALLATI

Page 18 - IMPORTANT

25 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 The focus shield reflector system can be adjusted to either side up to 45° from horiz

Page 19

26 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 NOTE: Except for the vent end plate hanger, all hangers must be installed with the ca

Page 20

27 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 11. FLUE VENTING Inadequate venting of a heater may result in asphyxiation, carbon

Page 21

28 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 HORIZONTAL VENT THROUGH THE SIDEWALL:  The flue vent system must slope downwards ap

Page 22 - (See Section 10)

29 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010  Use the approved 4" (10 cm) (JA-0528-XX) or 6" (15 cm) (JA-0529-XX) hori

Page 23 - Angle burner support

3 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 TABLE OF CONTENTS TOPIC ...PAGE INS

Page 24 - 175,000 & 200,000 Btuh

30 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 11A. Combined Length of Vent and Combustion Air Duct:  The individual flue vent or

Page 25

31 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 The air intake will not be located less than:  Three feet above grade  Twelve inc

Page 26

32 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 13. GAS SUPPLY - HEATER EXPANSION - FLEXIBLE GAS CONNECTION The gas supply must be in

Page 27

33 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 NOTE: Access to the manifold pressure test port is on the top of the valve. A 3/16&qu

Page 28

34 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 The flue vent, and combustion air duct (if installed) must also be configured in suc

Page 29

35 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 14. ELECTRICAL AND THERMOSTAT WIRING (WIRING DIAGRAMS PAGE 35 & 36) The heat

Page 30

36 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 Each tube heater requires 120V, 60 HZ electrical power sized for 145VA. The heater

Page 31 -  Three feet above grade

37 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 19. MULTIPLE TUBE HEATERS per THERMOSTAT Each tube heater requires 120V, 60 HZ ele

Page 32

38 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 20 SEQUENCE OF OPERATION GASLITER 50N DIRECT SPARK IGNITION (DSI) The Gasliter 50N is

Page 33

39 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010  CHECK 120V SUPPLY TO RELAY SWITCH  IF ELECTRICAL SUPPLY PROBLEM …. MAKE RE-QUIRE

Page 34

4 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 APPLICATION This model is approved for indoor and outdoor installation. A gas-fired ra

Page 35

40 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 MAIN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS CALL FOR HEAT ENDS: SYSTEM S

Page 36

41 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 22. SPARK IGNITION CIRCUIT The step-up transformer in the ignition control provides

Page 37

42 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 24. START-UP / COMMISSIONING SHEET COMMISSION

Page 38

43 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A HI

Page 39

44 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010  Manufactured and shipped in 10 ft lengths.  Swaged tube has approximate 4 inch

Page 40

45 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 FIGURE 22 HANGER SPACING / AIR INTAKE TO VENT LENGTH FIGURE 8 HANGER / REFLECTO

Page 41 - 3/16” 1/4”

46 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 26A. BURNER & TUBE KIT ASSEMBLY CHART MODELS STW-JZ / IW Models STW-JZ /IW have

Page 42 - WARNING

47 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 26B. BURNER & TUBE KIT ASSEMBLY CHART MODELS STW-JZ2 / IW2 Models STW-JZ2 /IW2

Page 43

48 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 27.GAS CONVERSION OF BURNER - MODELS STW-JZ / IW Burners for the STW-JZ / IW Models

Page 44

49 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 MODEL TURBULATOR LENGTH (IF REQUIRED) STW-JZ / IW 200-70/60/50 10’ (3 m) STW-JZ / I

Page 45 - FROM TUBE FLANGE]

5 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 Heater Expansion It is a normal condition that during heat-up and cool-down a tube he

Page 46 - ALUMINIZED STEEL

50 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 ORIFICE CHART - ALTITUDE CONVERSION ~ SEE NOTES ON PREVIOUS PAGE ~ 29. HIGH ALTITUD

Page 47 - STAINLESS STEEL

51 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 30. OPTIONAL ACCESSORIES Flue Vent Terminal 4” wall horizontal 6” wall horizontal J

Page 48

52 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 90 degree Elbow Kit*  Aluminized Steel JS-0508-JZ  Stainless Steel JS-0508-

Page 49 - 28. TURBULATORS:

53 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 #2 Lion Chain (115 lb work load) - 200 ft roll ‘S’ Hooks - 1 7/8” - package of 25

Page 50 - Supplied

54 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 31. REPLACEMENT PARTS STW-JZ (-JZ2) / IW (-2) Burner Model STW-JZ2 (stainless steel t

Page 51 - 30. OPTIONAL ACCESSORIES

55 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 SEE EXPLODED V IEW OF BURNER ON PREVIOUS PAGE# PART DESCRIPTION PART # PART DESCRIPTI

Page 52

56 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 STW-JZ (-JZ2) / IW (-2) TUBE SYSTEM PARTS # PART DESCRIPTION PART # PART DESCRIPTION

Page 53

57 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: STW-

Page 54 - 31. REPLACEMENT PARTS

6 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 Clearance to combustibles Location of flammable or explosive objects, liquids or vapo

Page 55

7 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 TABLE 1 MINIMUM CLEARANCES TO COMBUSTIBLES* FIGURE 1 MINIMUM CLEARANCES TO COMBUSTIB

Page 56 - TUBE SYSTEM PARTS

8 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 VENT END CLEARANCE: Clearances from the vent pipe are determined by local or national

Page 57 - LIMITED WARRANTY CERTIFICATE

9 STW-JZ / IW I&O Manual IM101229 RL: 12A- BA RD: DEC 2010 2. INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS Low intensity radiant tube heaters are