Schwank STS-JZ Manuel du propriétaire

Naviguer en ligne ou télécharger Manuel du propriétaire pour Cuisiniers Schwank STS-JZ. Schwank STS-JZ Owner`s manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 59
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
STS-JZ / IQ I&O Manual
IM101220
RD: MAY 2012
RL: 14D - BA
INSTALLATION / OWNER’S MANUAL
Improper installation, adjustment, alteration, service or
maintenance can cause property damage, injury or death.
Read the installation and operating and maintenance instruc-
tions thoroughly before installing or servicing this equipment.
SAFETY ALERT:
This heater must be installed and serviced only by a trained gas service techni-
cian. Failure to comply could result in personal injury, death, fire and/or property
damage.
Do not store or use gasoline or other flammable vapours and liquids in the
vicinity of this or any other gas fired appliance.
IF YOU SMELL GAS:
 Extinguish any open flame
 Do not attempt to light this or any other appliance
 Don’t touch any electrical switch, or telephone
 Immediately call your gas supplier from a neighbor’s phone
 Follow any and all instruction from your gas supplier
 If your gas supplier is not available, call the fire department
WARNING
FIELD CONVERTIBILITY:
This appliance is field con-
vertible to LP gas - except
inputs 100,000, 175,000,
and 200,000 Btuh.
Keep this manual in a secure place .
Record for future reference:
Model #:
Serial #:
(located on heater rating label)
Model
STS-JZ
LOW INTENSITY TUBE TYPE
INFRA RED HEATERS
&
Model
IQ
LOW INTENSITY TUBE TYPE
INFRA RED HEATERS
Vue de la page 0
1 2 3 4 5 6 ... 58 59

Résumé du contenu

Page 1 - INFRA RED HEATERS

STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA INSTALLATION / OWNER’S MANUAL Improper installation, adjustment, alteration, service

Page 2

10 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA WARNING Improper installation, adjustment, alteration, service or maintenance can c

Page 3 - GAS FIRED INFRARED

11 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 6. MOUNTING CLEARANCES This heater must be mounted with at least the minimum cleara

Page 4

12 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA * RECOMMENDED MOUNTING HEIGHTS are typical to provide optimum comfort in general sp

Page 5

13 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA System Configuration 1 Straight line 2 “U” tube with 2 x 90° elbow kits 3 “L”

Page 6

14 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 90° ELBOW KIT ASSEMBLY #1 Add the coupler to the 90° elbow over the swaged en

Page 7 - PROMINENT LOCATION

15 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA #6 After installation of the elbow assembly, fasten the corners of the reflecto

Page 8

16 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA #11/A Suspend with 3 chains in horizontal posi-tion and continue installing

Page 9

17 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 8. SUSPENDING THE SYSTEM - GENERAL Inadequate or improper suspension of the tube he

Page 10 - WARNING

18 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 5) Please NOTE that each hanger has a ‘flat’ side and a ‘cavity’ side – FIGURE 6 a

Page 11 - FIGURE 2

19 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA FIGURE 8 REFLECTOR STABILIZER FIGURE 9 PLATE HANGER/ELBOW INSTALLATION see se

Page 12 - RL: 14D - BA

2 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA NOTICE: This manual is current for this product. Occasional revision of the product

Page 13

20 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 8-A. SEISMIC RESTRAINT - LATERAL AND LONGITUDINAL In areas prone to earthquake, or

Page 14

21 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 9. BURNER AND TUBE INSTALLATION PRIOR TO PROCEEDING with the tube installation: R

Page 15

22 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 7) NOTE: 100,000 x 20 ft and 175,000 & 200,000 Btuh Systems:  Refer to Se

Page 16

23 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA STS-JZ / IQ 110-50 not required STS-JZ / IQ 130-30 14' (4.3 m) STS-JZ / IQ

Page 17

24 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA · Do not loosen or remove the fifth nut directly below the burner flange · Secure s

Page 18 - IMPORTANT

25 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA SPECIAL COUPLER INSTALLATION 1. Install first tube so that the welded seam along

Page 19

26 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA SPECIAL COUPLER INSTALLATION 1. Note the 2 holes opposite each other at the swaged

Page 20

27 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA The focus shield reflector system can be adjusted to either side up to 45° from hor

Page 21

28 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA NOTE: Except for the vent end plate hanger, all hangers must be installed with the

Page 22 - (See Section 10)

29 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 11. FLUE VENTING Inadequate venting of a heater may result in asphyxiation, carb

Page 23

3 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA TABLE OF CONTENTS TOPIC ...PAGE I

Page 24 - Angle burner support

30 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA HORIZONTAL VENT THROUGH THE SIDEWALL:  Any horizontal portion of the flue vent sy

Page 25 -  100,000 x 20 ft

31 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA  Use approved 4" (10 cm) (JA-0528-XX) or 6" (15 cm) (JA-0529-XX) horizo

Page 26 - ¼” hole at the female end

32 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 11A. Combined System Length: Tube Heater + Vent + Combustion Air Duct: MINIMUM VEN

Page 27

33 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 12. COMBUSTION AIR DUCTING Do not install filters on the combustion air intake. E

Page 28

34 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 13. GAS SUPPLY - HEATER EXPANSION - GAS CONNECTION The gas supply must be installed

Page 29 - WARNING

35 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA NOTE: Access to the manifold pressure test port is on the top of the valve. A 3/16&

Page 30

36 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA The flue vent, and combustion air duct (if installed) must also be configured in s

Page 31

37 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 14. ELECTRICAL AND THERMOSTAT WIRING (WIRING DIAGRAMS PAGE 37 & 38) The he

Page 32

38 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 18. WIRING DIAGRAM: 24V OR 120 VOLT THERMOSTAT OPERATION SINGLE HEATER PER THERMOS

Page 33

39 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 19. MULTIPLE TUBE HEATERS per THERMOSTAT Each tube heater requires 120V, 60 HZ e

Page 34

4 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA APPLICATION A gas-fired radiant tube heater may be installed for heating of commerci

Page 35

40 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 20 SEQUENCE OF OPERATION The S87 ignition control module is powered by a 24v trans

Page 36

41 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA  CHECK 120V SUPPLY TO RELAY SWITCH  IF ELECTRICAL SUPPLY PROBLEM …. MAKE RE-QUI

Page 37

42 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA MAIN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS CALL FOR HEAT ENDS: SYSTEM

Page 38

43 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 22. SPARK IGNITION CIRCUIT The step-up transformer in the ignition control provid

Page 39

44 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA LOW/ UNSTEADY FLAME CURRENT If the current to the S87 flame circuit is less than 1.

Page 40

45 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 24. START-UP / COMMISSIONING SHEET COMMISSI

Page 41

46 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A

Page 42

47 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA  Manufactured and shipped in 10 ft lengths.  Swaged tube has approximate 4 inc

Page 43 - 3/16” 1/4”

48 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA FIGURE 25 HANGER SPACING / AIR INTAKE TO VENT LENGTH FIGURE 26 HANGER / REFLE

Page 44

49 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 26. BURNER & TUBE KIT ASSEMBLY CHART MODELS STS-JZ / IQ MODELS STS-JZ & I

Page 45

5 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA Heater Expansion It is a normal condition that during heat-up and cool-down a tube

Page 46

50 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 27. GAS CONVERSION OF BURNER - MODELS STS-JZ / IQ Burners for the STS-JZ / IQ Mode

Page 47

51 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA When this appliance is installed above the altitude stipulated below, the input mus

Page 48 - FROM TUBE FLANGE]

52 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA Altitude Restrictions this Model: - also see notes previous page 1. Do not install

Page 49 - MODELS:

53 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 29. OPTIONAL ACCESSORIES Flue Vent Terminal 4” wall horizontal 6” wall horizontal

Page 50

54 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 90 degree Elbow Kit* - Aluminized Steel *Kit includes: 1. elbow, 2. tube couple

Page 51

55 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA #2 Lion Chain (115 lb work load) - 200 ft roll Safety Snap Hooks - 2” - package o

Page 52 - Supplied

56 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 30 REPLACEMENT PARTS LIST STS-JZ / IQ Burner 30 REPLACEMENT PARTS LIST

Page 53 - 29. OPTIONAL ACCESSORIES

57 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA

Page 54

58 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA # PART DESCRIPTIONPART #PART DESCRIPTION PRIMARY SUPPLEMENT30WEBBED HANGERJS-0505-J

Page 55

59 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: ST

Page 56 - STS-JZ / IQ Burner

6 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA Clearance to combustibles Location of flammable or explosive objects, liquids or va

Page 57

7 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA TABLE 1 MINIMUM CLEARANCES TO COMBUSTIBLES* FIGURE 1 MINIMUM CLEARANCES TO COMBUST

Page 58 - TUBE SYSTEM PARTS

8 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA VENT END CLEARANCE: Clearances from the vent pipe are determined by local or nationa

Page 59 - LIMITED WARRANTY CERTIFICATE

9 STS-JZ / IQ I&O Manual IM101220 RD: MAY 2012 RL: 14D - BA 2. INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS Low intensity radiant tube heaters a

Commentaires sur ces manuels

Pas de commentaire