STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A INSTALLATION / OWNER’S MANUAL Improper installation, adjustment, alteration, servic
10 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A WARNING Improper installation, adjustment, alteration, service or maintenance can
11 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 6. MOUNTING CLEARANCES This heater must be mounted with at least the minimum clear
12 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A IMPORTANT: Single or multiple heater placement must be such that continu-ous opera
13 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 7. SUSPENDING THE SYSTEM - GENERAL Inadequate or improper suspension of the tube h
14 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 6 Please NOTE that each hanger has a ‘flat’ side and a ‘cavity’ side – FIGURE 6 a
15 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A FIGURE 8 REFLECTOR STABILIZER FIGURE 9 PLATE HANGER/ELBOW INSTALLATION see s
16 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A System Configuration 1 Straight line 2 “U” tube with 2 x 90° elbow kits 3 “L
17 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 90° ELBOW KIT ASSEMBLY #1 Add the coupler to the 90° elbow over the swaged e
18 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A #6 After installation of the elbow assembly, fasten the corners of the reflect
19 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A #11/A Suspend with 3 chains in horizontal posi-tion and continue installin
2 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A NOTICE: This manual is current for this product. Occasional revision of the produc
20 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 9. BURNER AND TUBE INSTALLATION PRIOR TO PROCEEDING with the tube installation:
21 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A e) Check that the first tube is level 3) Install a focus shield reflector over t
22 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A · Do not loosen or remove the fifth nut directly below the burner flange · Secure
23 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A NG or LP 110,000 x 50 ** 2' (0.6 m) ** 2’ FACTORY INSTALLED IN 3rd TUBE NG
24 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A TURBULATOR LENGTH & LOCATION IN SYSTEM:
25 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A SPECIAL COUPLER INSTALLATION 1. Install first tube so that the welded seam along
26 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A SPECIAL COUPLER INSTALLATION 1. Note the 2 holes opposite each other at the swage
27 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A The focus shield reflector system can be adjusted to either side up to 45° from ho
28 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A NOTE: All hangers must be installed with the cavity side facing the burner end of
29 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 11-A. SEISMIC RESTRAINT - LATERAL AND LONGITUDINAL In areas prone to earthquake,
3 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A TABLE OF CONTENTS TOPIC ...PAGE
30 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 12. FLUE VENTING Inadequate venting of a heater may result in asphyxiation, car
31 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A HORIZONTAL VENT THROUGH THE SIDEWALL: Any horizontal portion of the flue vent s
32 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A Use approved 4" (10 cm) (JA-0528-XX) or 6" (15 cm) (JA-0529-XX) horiz
33 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A VERTICAL VENT THROUGH THE ROOF: It is the sole responsibility of the installer to
34 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 13. COMBUSTION AIR DUCTING Do not install filters on the combustion air intake.
35 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 14. GAS SUPPLY - HEATER EXPANSION - GAS CONNECTION The gas supply must be installe
36 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A NOTE: Access to the manifold pressure test port is on the top of the valve. A 3/16
37 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A The flue vent, and combustion air duct (if installed) must also be configured in
38 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 15. ELECTRICAL AND THERMOSTAT WIRING (WIRING DIAGRAMS PAGES 38 & 39) The
39 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 18. FENWAL DSI: WIRING DIAGRAM: 24V OR 120 VOLT THERMOSTAT OPERATION SINGLE HEAT
4 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A APPLICATION A gas-fired radiant tube heater may be installed for heating of commerc
40 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 19A. MULTIPLE TUBE HEATERS per 24VAC THERMOSTAT (Fenwal DSI)
41 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 20. FENWAL DSI: SEQUENCE OF OPERATION / FLAME RECOVERY / SAFETY LOCKOUT Power Up /
42 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A Flame Fault If at any time the main valve fails to close completely and maintains
43 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A USE THE BLACK BARS BELOW AS A GUIDE FOR AD-JUSTMENT. USE THE BARS THAT COINCI
44 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 21. TROUBLESHOOTING GUIDE - FENWAL DSI (also see Heater Troubleshooting next page)
45 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A SET THERMOSTAT TO CALL FOR HEAT APPLY 120 VOLTS - GREEN LIGHT IS ON CHECK 120V
46 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A MAIN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS CALL FOR HEAT ENDS: SYSTE
47 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 23. START-UP / COMMISSIONING SHEET COMMISS
48 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A
49 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A Manufactured and shipped in 10 ft lengths. Swaged tube has approximate 4 in
5 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A Heater Expansion It is a normal condition that during heat-up and cool-down a tube
50 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A FIGURE 25 HANGER SPACING / AIR INTAKE TO VENT LENGTH FIGURE 26 HANGER / REFL
51 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 25. BURNER & TUBE KIT ASSEMBLY CHART MODELS STS-JZ / IQ MODELS STS-JZ &
52 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 26. GAS CONVERSION OF BURNERS Tube Heater Burners are factory produced and suppl
53 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 27. HIGH ALTITUDE INSTALLATION Canada: Heaters can be installed to an altitude
54 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A Altitude Restrictions this Model: - also see notes previous page 1. Do not instal
55 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 28. OPTIONAL ACCESSORIES Flue Vent Terminal 4” wall horizontal 6” wall horizonta
56 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 90 degree Elbow Kit* - Aluminized Steel *Kit includes: 1. elbow, 2. tube coupl
57 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A #2 Lion Chain (115 lb work load) - 200 ft roll Safety Snap Hooks - 2” - package
58 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 29. REPLACEMENT PARTS LIST: Model & Serial Numbers Required # PART DESCRIPT
59 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A # PART DESCRIPTION PART # PART DESCRIPTION PRIMARY SUPPLEMENT 7 EQUALIZER PLATE JS
6 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A Clearance to combustibles Location of flammable or explosive objects, liquids or v
60 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A # PART DESCRIPTION PART # PART DESCRIPTION PRIMARY SUPPLEMENT 22 INDICATOR LAMPS
61 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A STS-JZ / IQ TUBE SYSTEM PARTS # PART DESCRIPTION PART # PART DESCRIPTION PRIMA
62 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A HONEYWELL S87J DSI: WIRING DIAGRAM: 24V OR 120 VOLT THERMOSTAT OPERATION SINGLE H
63 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A HONEYWELL S87J: SEQUENCE OF OPERATION The S87 ignition control module is powered
64 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A CHANNEL MICRO 50N: WIRING DIAGRAM: 120 VOLT THERMOSTAT CONTROL (24V Thermostat—nex
65 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A CHANNEL MICRO 50N DSI: SEQUENCE OF OPERATION The MICRO 50N is a three trial igniti
66 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A CHANNEL MICRO 50N IGNITION CONTROL - SPECS The MICRO 50N is a microprocessor-base
67 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: S
7 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A TABLE 1 MINIMUM CLEARANCES TO COMBUSTIBLES* FIGURE 1 MINIMUM CLEARANCES TO COMBUS
8 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A VENT END CLEARANCE: Clearances from the vent pipe are determined by local or nation
9 STS-JZ-F / IQ-F I&O Manual IM101220 RD: AUGUST 2014 RL: 18A 2. INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS Low intensity radiant tube heaters
Commentaires sur ces manuels