9. FLUE VENTING
THIS STR-JZ SERIES IS APPROVED FOR DIRECT VENTING APPLICATIONS. THE
SYSTEM MUST NOT BE OPERATED WITHIN A NEGATIVE AIR CONDITION, UNLESS
COMBUSTION AIR IS BROUGHT IN FROM OUTSIDE DIRECTLY TO THE BURNER.
I
F A SEVERE NEGATIVE PRESSURE IS EXPERIENCED OR ANTICIPATED, THE
SECOND PORT (BARB) ON THE BLOCKED FLUE SWITCH SHOULD BE CONNECTED
DIRECTLY TO OUTSIDE AIR USING 1/4” PLASTIC HOSE FROM BLOCKED FLUE
SWITCH TO OUTSIDE OF BUILDING (NOT SUPPLIED).
DIRECT VENTED APPLICATION
A minimum 6” length of single-wall ‘C’ Vent is to be installed on the swaged end of the last
tube before any Tee or Elbow is fitted. All venting must be single wall "C" vent except that
portion of vent passing through a combustible wall or roof then type "B" vent may be used as
per CSA's interim requirement. When venting horizontally, the flue vent system must slope
downwards approximately 1/4" per foot toward the vent terminal, starting at the termination of
the radiant tube. For horizontal through the wall venting, the approved manufacturer 4" or 6"
horizontal wall vent terminal (JA-0528/9) should be used and mounted 18" from the outside
wall to the inside edge of terminal opening to alleviate back pressure caused by turbulent wind
conditions (See Fig 17). This will also ensure flue gases are directed away from the structure to
protect building materials from degradation by the exhausted flue gases. It is the responsibility
of the installer to be familiar with current local codes or ANSI Z223.1 / CSA.B149.1-00 latest
editions for all venting requirements, and practices.