Schwank IO-100 Manuel du propriétaire Page 3

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 45
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 2
2100 / IO 100 Manual
IM110107
RD: MAY 2014
R.L. 4A
3
TABLE OF CONTENTS
TOPIC PAGE NUMBER
IMPORTANT INFORMATION - READ FIRST
IMPORTANT WARNINGS............................4
HEATER EXPANSION .................................5
GAS CONNECTION .....................................5
VENTING ................................................5, 13
‘SMOKE’ & DISCOLORATION ....................5
MOUNTING CLEARANCES:
OUTDOORS...........................................6
INDOORS ...............................................9
DIMENSIONS & CONFIGURATION ..........11
MOUNTING KIT OPTIONS................. 12 - 15
1. APPLICATION ..................................................16
OUTDOOR / PATIO .....................................16
INDOOR INSTALLATION.............................16
2. AIRCRAFT HANGARS .....................................17
3. GARAGES & PARKING STRUCTURES ..........17
4. OTHER THAN SPACE HEATING.....................17
5. PRE-INSTALLATION SURVEY ........................17
6. INSTALLATION REQUIREMENTS...................18
6.1 MOUNTING CLEARANCES ......................18
6.2 HEATER MOUNTING................................18
7. GAS SUPPLY PIPING......................................19
7.1 GAS PRESSURE.......................................19
Models: 2100; 2100-SS; 2152; 2152-SS
IO-100; IO-100-SS; IO-152; IO-152-SS
Patio Heater for Outdoor Application
and Gas-Fired Luminous (High Intensity) Infrared Heater
for Commercial / Industrial Non-Residential Indoor Spaces
TOPIC PAGE NUMBER
8. ELECTRICAL - BASIC REQUIREMENTS ……..19
9. LAYOUT, COMFORT & CONTROL.................20
10. INSTALLATION PROCEDURES.....................21
11. LIGHTING INSTRUCTIONS............................22
11.1 SHUT DOWN INSTRUCTIONS..............22
12. HEATER FINISH & APPEARANCE.................22
13. SERVICING GUIDE.........................................23
14. VENTILATION FOR INDOOR APP’S..............24
15. REMOTE CONTROL OPTIONS......................25
Remote Control Quick Setup ................26 - 30
16. SEQUENCE OF OPERATION-FENWAL 35-60
DSI...................................................................31
17. SPARK IGNITION CIRCUIT ...........................32
18-A WIRING DIAGRAM - SINGLE-STAGE.........33
18-B WIRING DIAGRAM - TWO-STAGE..............34
18-C WIRING - 2-STAGE SWITCH CONTROL ....35
19. TROUBLESHOOTING GUIDE ........................36
20. COMMISSIONING REPORT...........................38
21. HIGH ALTITUDE DERATION.........................40
22. ACCESSORIES: Control & Mounting ..............41
23. REPLACEMENT PARTS LIST.........................43
Stainless Steel Enclosure Components...........44
LIMITED WARRANTY ........................Back Page
IMPORTANT
Installer: Present this manual to the end user. Acquaint the
end user with Important Information: Cover & pages 4 to 7.
END USER: In particular you must be aware of ‘Clearances to Combustible’ re-
quirements and the limitations of stacking or placing material near the heaters.
Inform your safety personnel and staff of this information.
Vue de la page 2
1 2 3 4 5 6 7 8 ... 44 45

Commentaires sur ces manuels

Pas de commentaire